VRHJetworks provides comprehensive airport passenger boarding bridge installation construction services and solutions. Our expertise in the procurement, construction management, and maintenance of airport ground support equipment (GSE) includes:

  • Passenger Boarding Bridges
  • Ground Power Units
  • Pre-Conditioned Air Units
  • EV charging stations
  • VDGS
  • Security Equipment Systems Integration
  • Commissioning

VRHJetworks provides a general contractor-led approach to the installation of these systems. As a division of VRH, we leverage the corporate bonding and insurance program, resources including diversity compliance and sustainability, and the company’s extensive subcontractor relationships.

Most importantly, VRHJetworks benefits from 65 years of extensive aviation construction experience that VRH brings to every project. We engage in careful preconstruction planning and coordination with the base building facility, covering all aspects of new construction and renovation programs, electrical upgrades, and coordination with local authorities. Whether VRH is performing the base building program or another firm, our staff fully understands what is required to maintain your operational continuity.

Additionally, given the depth of VRH’s A/E relationships within the industry, we offer design services, support & management for a seamless, one-stop solution to engineer, procure and construct your facility’s GSE solution.

Tom Giles, the Director of VRHJetworks, has more than 40 years of industry experience. His knowledge and intense focus on customer service has earned him a well-deserved reputation as an accomplished leader with extensive familiarity in the specialized operation, maintenance, and troubleshooting of airport ground service equipment for aviation clients.
VRHJetworks provides comprehensive airport passenger boarding bridge installation construction services and solutions. Our expertise in the procurement, construction management, and maintenance of airport ground support equipment (GSE) includes:
  • Passenger Boarding Bridges
  • Ground Power Units
  • Pre-Conditioned Air Units
  • EV charging stations
  • VDGS
  • Security Equipment Systems Integration
  • Commissioning
VRHJetworks provides a general contractor-led approach to the installation of these systems. As a division of VRH, we leverage the corporate bonding and insurance program, resources including diversity compliance and sustainability, and the company’s extensive subcontractor relationships.

Most importantly, VRHJetworks benefits from 65 years of extensive aviation construction experience that VRH brings to every project. We engage in careful preconstruction planning and coordination with the base building facility, covering all aspects of new construction and renovation programs, electrical upgrades, and coordination with local authorities. Whether VRH is performing the base building program or another firm, our staff fully understands what is required to maintain your operational continuity.

Additionally, given the depth of VRH’s A/E relationships within the industry, we offer design services, support & management for a seamless, one-stop solution to engineer, procure and construct your facility’s GSE solution.

Tom Giles, the Director of VRHJetworks, has more than 40 years of industry experience. His knowledge and intense focus on customer service has earned him a well-deserved reputation as an accomplished leader with extensive familiarity in the specialized operation, maintenance, and troubleshooting of airport ground service equipment for aviation clients.

Lehigh-Northampton Airport Authority New Passenger Boarding Bridges, ABE

This project entailed providing new passenger boarding bridges for two gates for Lehigh-Northampton Airport Authority at Lehigh Valley International Airport.

Vantage Airport Group
Terminal 7 Mobile Bus Ramp, JFK

This project entailed installing a mobile stair as a part of a bussing operation for Vantage Airport Group at Terminal 7, Gate 10, John F. Kennedy International Airport.

DJ Keating
PC Air Upgrades Gates E1, E3, E5

This project entailed the removal of three (3) existing 30-ton PCAs and the installation of 3 60-ton PCAs and the upgrade of the precondtioned air units (PCAir) and ground power units at six (6) gates for DJ Keating Company at Terminal E, Philadelphia International Airport.

JBT AeroTech
Dreamliner Electrical Upgrades, PHL

This project entailed the installation upgrades to four (4) American Airlines Gates for JBT AeroTech, Jetway Systems at Philadelphia International Airport.

JFKIAT
Remove, Dispose & Replace 7 PBBs, JFK

This project, completed utilizing the design-build delivery method, entailed the removal, disposal, and installation of seven (7) passenger boarding bridges for JFKIAT at Terminal 4, John F. Kennedy International Airport.

JFKIAT Remove, Dispose & Replace 7 PBB, JFK​

This project, completed utilizing the design-build delivery method, entailed the removal, disposal, and installation of seven (7) passenger boarding bridges for JFKIAT at Terminal 4, John F. Kennedy International Airport.

Syracuse Regional Airport Authority
Passenger Boarding Bridge Replacement, Gates 12 & 23, SYR

This project entailed the removal of 2 existing corrugated steel passenger boarding bridges and installation of two (2) new glass truss passenger boarding bridges at Gates 12 and 23 for Syracuse Regional Airport Authority at Syracuse Hancock International Airport.

United Airlines
Passenger Boarding Bridge Replacement Gates C90 & C92, EWR

This project entailed the removal and reinstallation of two (2) new passenger boarding bridges for United Airlines at Terminal C, Newark Liberty International Airport.

Atlantic City International Airport
Passenger Boarding Bridge Replacement, ACY

This project entailed the removal and reinstallation of one passenger boarding bridge at Gate 4 for the South Jersey Transportation Authority at Atlantic City International Airport.

Westchester County Airport
Passenger Boarding Bridge Replacement, HPN

This project entailed the replacement of two (2) passenger boarding bridges (PBB) at Gates 1 and 2 for ThyssenKrupp Airport Systems at Westchester County Airport.

JFKIAT
e-GSE Mockup Installation, Terminal 4, Gate A3, JFK

This project entailed the installation of one new Webasto GSE Intellegent Fast Charging System Model MVS-400, including a Power Server and Power Station, capable of charging (4) Electric vehicles for JFK International Air Terminal at Terminal 4, Gate A3, John F. Kennedy International Airport.