Cargo Buildings
Cargo Buildings
United Airlines 100 Frontage Road Cargo Fit Out, EWR
United Airlines 100 Frontage Road Cargo Fit Out, EWR
This project entailed the fit out consisting of office build out and mechanical handling equipment installation for an off-airport cargo facility for United Airlines at Newark Liberty International Airport. VRH provided preconstruction and construction services as the CMAR for this project.
Realterm
Cargo Facility, JFK
This project entailed the construction of a new 350,000 s.f., ground-up, LEED-certified, Class A warehouse and office space facility with over sixty (60) truck dock positions and three (3) aircraft parking positions for Realterm at Cargo Area D, adjacent to North Boundary Road at John F. Kennedy International
Airport. As a sole-venture project for VRH, this project is also the first new ground-up facility built at JFK in the last three decades.
Realterm Cargo Facility, JFK
Delta Air Lines
Cargo Building 21 Refrigerated Storage Addition
This project entailed the construction of a one-story, insulated, pre-engineered structure with an overall area of approximately 16,000 s.f. for Delta Air Lines at Building 21, John F. Kennedy International Airport.